Drinking Water Supply (Design & DPR)
- Project completed – 20
- Populaiton designed for > 25 Lakhs
- Length of pipeline designed > 2000 km
Underground Drainage Scheme (Design & DPR)
- Project completed – 8
- Populaiton designed for > 10 Lakhs
- Length of pipeline designed > 1100 km
Water Sector Reform Works (Other Than Design & DPR Works)
- Coverage – 15 Towns and 20 Periurban Villages
- Hydraulic Modeling > 2000 km pipeline & > 15 Lakh Population
- Water Audit > 750 Sqkm AOI & > 5 Lakh Population
- Energy Audit > 75 No. Of Pumps
- Flow meters > 200 Installation and Maintenance
- GIS Mapping > 850 Sqkm
- Topographic Survey > 3000 km length
- Consumer Survey > 2,10,000 Properties
- Water Billing and Collection > 27,000 Connetions For 8 Councils/ Villages
- Project completed – 5
- Populaiton designed for > 3.5 Lakhs
- Area covered > 125 Sqkm
- Projects completed – 11
- Populaiton designed for > 6.5 Lakhs
- Area covered > 200 Sqkm